Headed down today for a look
freeride area looking a bit better, still needs some work though, theyve been 2 focused on adding a new line in, the alterations we made to the dual have started to harden in, but people had ridden them in the wet and caused some major case marks in the landing, so sorted that
then smoothed all the tyre tracks before the jumps and round the berm on the top half from people riding in the wet, and carpeted over incase more people ride
no idea whats gone on at the top by the table, the ground seems to have gone realy bumpy
and huge lumps that werent there before, but didnt have a big enough spade to sort it
still needs quite a bit of work and the ground is starting 2 get solid and dryer already, so going to need to try and get as many people doing as much work as possible over the next few weekends